Understand SBEM calculations for England Part L: BER and BPER compliance, BRUKL reports, approved software, EPCs, air testing and the 2026 Future Buildings Standard.

Why Part L SBEM Compliance?

SBEM (Simplified Building Energy Model) is the calculation tool used to assess the energy efficiency of non-residential buildings in the UK. It ensures your building complies with the energy and emission standards outlined in Part L of the Building Regulations. By completing an SBEM assessment, you comply with regulatory requirements, improve energy efficiency, and reduce operational costs.

With increasing focus on sustainability and energy performance, SBEM compliance helps your building stay ahead of the curve and supports the UK’s zero-carbon goals.

When is an SBEM calculation needed?

 

An SBEM calculation is normally needed for a new non-domestic building in England. It is part of the approved National Calculation Methodology (NCM) route used to show that a proposed building meets the energy-performance requirements in Part L of the Building Regulations. The calculation compares the proposed building with a notional building of the same size and shape. At design stage and again when the building is complete, the actual building must meet both its carbon-emissions and primary-energy targets. (ADL2) (EPD)

 

The service is often described as a “Part L SBEM calculation”, but that shorthand needs care. SBEM is one approved way to implement the NCM; it is not the legal standard itself and it is not the only permitted calculation route. An approved dynamic simulation model (DSM) can also be used where it is suitable for the project. The output most clients recognise is the Building Regulations UK Part L report, or BRUKL report, which presents the calculation evidence in a standardised form. (ADL2) (NCM Modelling Guide)

 

For an ordinary new-build project, the calculation should begin while the design can still change. Waiting until construction or completion can make the response expensive. A failed design result can require changes to fabric, glazing, lighting, HVAC, controls, air permeability or on-site generation. A poor as-built result can then delay the final Part L submission even where the design-stage report passed.

 

The Part L 2021 guidance remains the current technical baseline for projects within that regime. The published Part L 2026 / Future Buildings Standard changes generally take effect in 2027, subject to building-specific transition rules. Wales, Scotland and Northern Ireland use separate standards and calculation-method approvals. (ADL2) (Approved software)

What SBEM does and what it does not do

 

SBEM means Simplified Building Energy Model. It is the simplified calculation engine used within the NCM for buildings other than dwellings. It applies standardised assumptions to building geometry, activity, construction, glazing, heating, cooling, ventilation, domestic hot water, lighting, controls and on-site generation. The NCM uses those assumptions to compare an actual building with a notional reference building consistently. (NCM Modelling Guide) (ADL2)

 

The calculation is an asset and compliance assessment, not a prediction of a particular occupier’s bills or carbon footprint. The operating hours, occupancy, internal gains and control patterns used in the NCM are standardised. Actual energy use also depends on tenant fit-out, management, weather, maintenance, setpoints, IT loads, operating hours and user behaviour. Approved Document L is explicit that Building Regulations compliance outputs should not be used directly as an actual-energy forecast. Where a project needs an operational prediction, that should be a separate, appropriately scoped exercise, such as a CIBSE TM54 assessment.

 

The distinction matters commercially. A low BPER or BER supports Part L compliance under the prescribed methodology. It does not guarantee a specific utility cost, operational rating or Energy Performance Certificate (EPC) grade. Equally, a detailed design model may be valuable for system design or operational analysis but is not automatically an approved Part L calculation.

 

TermMeaningWhat clients should not confuse it with
NCMThe National Calculation Methodology: the rules, data and standard assumptions for non-domestic energy compliance and asset ratings.A generic energy model or a forecast of actual annual consumption.
SBEMThe BRE-developed simplified implementation of the NCM.The law itself, a design-sizing tool or the only permissible Part L method.
iSBEMThe basic interface for the SBEM engine.A blanket approval for every iSBEM version, patch or regulatory regime.
DSMAn approved Dynamic Simulation Model that implements the NCM.A general simulation automatically accepted for Part L or EPC purposes.
BRUKL reportThe standardised Building Regulations UK Part L output from approved software.An EPC, a pressure-test certificate or a planning energy statement.
Non-domestic EPCA registered asset-rating certificate with its own statutory trigger and assessor/lodgement process.Proof that every Part L duty and construction evidence requirement has been met.

The right question is therefore not simply, “Do I need SBEM?” It is: Does the building need a Part L calculation, which approved NCM implementation is suitable, and which formal outputs are required at each stage?

The current Part L 2021 route for new non-domestic buildings

 

For England projects governed by the 2021 Part L regime, Approved Document L Volume 2 is the principal statutory guidance for buildings other than dwellings. The statutory framework requires an approved calculation of the target carbon-dioxide emission rate and target primary-energy rate for a new building. The constructed building must not exceed either target. (ADL2) (EPD)

 

The calculation is based on two versions of the same building. The notional building follows standard NCM reference specifications. The actual building represents the project’s proposed or installed fabric and systems. The notional and actual buildings use the same geometry, orientation, activity, zoning and exposure. This produces targets that are specific to the building rather than one national BER or BPER number that can be copied from another project(ADL2) (EPD)

BER and BPER: the two key Part L comparisons

 

A successful non-domestic Part L calculation is not just a “carbon pass”. England’s 2021 regime requires two linked whole-building comparisons.

 

Actual-building metricTarget metricPlain-English definitionTest at design and completion
BER — Building Emission RateTER — Target Emission RateThe calculated carbon-dioxide emissions of the actual building, normally expressed in kgCO₂/m²/year.BER must not exceed TER.
BPER — Building Primary Energy RateTPER — Target Primary Energy RateThe calculated primary energy associated with the actual building, normally expressed in kWhPE/m²/year. It accounts for energy used upstream to produce and deliver fuels and electricity.BPER must not exceed TPER.

In Approved Document L, the full forms building emission rate and building primary energy rate should be used on first reference. BER, TER, BPER and TPER are common industry and BRUKL shorthand. These results are cumulative: passing BER does not excuse a BPER failure, and vice versa.(ADL2) (NCM Modelling Guide)

 

The performance approach gives design flexibility. The actual building does not need to replicate every feature of the notional building. A project may use a different coordinated combination of fabric, systems, controls and generation if it meets both targets and the other applicable requirements. It is not safe, however, to select a single feature—such as photovoltaic panels, a heat pump or a low U-value wall—and assume it will make the whole building compliant.

Design-stage and as-built SBEM calculations

 

Part L evidence is a two-stage process. Before work starts, the design calculation records the target and actual rates and the specification that supports them. At completion, the calculation must be updated using as-constructed information. Approved Document L recommends issuing the calculations as design-stage and as-built BRUKL reports, with the specification and changes recorded. The same approved calculation tool should calculate the targets and actual results at both stages. (ADL2) 

 

StageWhat the project team needs to establishTypical output and evidence
Feasibility / conceptUse, activity, floor areas, likely HVAC strategy, facade ratio, roof area, orientation, massing and likely energy hierarchy.Early SBEM or DSM appraisal; risks and design options, clearly labelled as preliminary.
Design stageConfirmed geometry, fabric, glazing, thermal bridges, HVAC, hot water, ventilation, lighting, controls, renewables and proposed air permeability.Design BRUKL report; target and actual rates; specification schedule; relevant pre-start Part L information.
ConstructionProduct substitutions, installation details, air barrier, junctions, installed services, commissioning and controls.Change register, product data, photographs, test certificates and commissioning evidence.
As built / completionThe final installed specification and measured results.As-built BRUKL report, updated BER/BPER, air-test evidence where required, EPC and handover information through the correct routes.

The design BRUKL is not a permission to substitute products freely. A different curtain wall, lighting schedule, fan power, heating plant, control package or air-test result can change the final BER and BPER. A disciplined change register prevents the final model becoming a reconstruction exercise when the building is almost complete.

More than BER and BPER: limiting standards and services

 

The calculation tests sit alongside other Part L requirements. The 2021 guidance includes limiting standards for thermal elements and air permeability, services efficiency and control provisions, commissioning, information for owners and solar-gain checks for occupied or mechanically cooled non-residential spaces.

For example, the current Volume 2 recognised route gives a new-building air-permeability limiting value of 8.0 m³/(h·m²) at 50 Pa. This is a backstop, not a recommended universal design target. The measured result still has to be entered into the final calculation, and the as-built BPER and BER must still meet TPER and TER. A building can test below 8.0 and nevertheless fail one or both calculated rates. (ADL2)

 

This is why energy compliance should coordinate the architect, façade team, MEP engineer, contractor and air tester. The calculation must accurately reflect the final building; it cannot create performance after the air barrier, services route and control strategy have been fixed.

For a detailed explanation of test timing, pressure-test routes and common leakage points, see the planned Air Tightness Testing pillar page.

Which SBEM software should be used?

 

The answer is not “the newest program on the desktop”. For Part L, approval is specific to the software product, version, engine and regulatory route. The UK NCM’s official approved-software list is the controlling check, not a generic vendor statement or the ability of an application to export a PDF labelled BRUKL.(Approved Software).

 

Under the England Part L 2021 entries on the official list checked in April 2026, iSBEM, DesignBuilder and IES VE each have a valid role. The table below identifies the verified entries, not an endorsement of later releases or every module.

 

OptionVerified England Part L 2021 routeWorkflow and typical fitEssential limitation or check
iSBEM v6.1.eDirect SBEM route; official list identifies SBEM engine v6.1.e.1.The basic SBEM interface. Appropriate where the building can be represented adequately through the standard SBEM workflow.It is a locally installed Access-based application and is principally a compliance/EPC tool, not a system-sizing platform. Check the applicable engine and patch level.(Approved software)
DesignBuilder v7.3.1Officially listed both as an EnergyPlus DSM and as an FI-SBEM interface using SBEM v6.1.e.2.A graphical/3D workflow that can support either approved SBEM-interface or approved DSM routes, depending on the selected analysis.The route must be stated and the precise approved build/engine must match the official list. A generic DesignBuilder simulation is not automatically a Part L output.(Approved software)
IES VE v7.0.31Officially listed both as an ApacheSim DSM and as an FI-SBEM interface using SBEM v6.1.e.2.Can use an existing VE model for the SBEM or DSM compliance workflow, with regulation-specific inputs.Confirm the installed compliance engine and selected route. Some publisher help pages contain historic references, so the official list and report header are decisive.(Approved software)

FI-SBEM means a third-party interface used with the SBEM engine. It is not a separate methodology. A design team should not describe every 3D model, thermal model or software output as “SBEM compliant” simply because it originated in an application that also has an approved NCM module.

 

SBEM may be used for buildings of any size, but the NCM recognises that some features require approximation. Examples include ventilated double-skin façades and daylight transfer through highly glazed atria or light wells. An approved DSM can be more flexible and can be more useful for design support in such cases. A DSM is not automatically necessary because a building is large, nor is it automatically more accurate in every project. The selection should be based on whether the proposed features can be represented properly and whether the software implementation is approved for the intended output.3

 

A robust software decision has four steps. First, confirm the building’s applicable Part L regime. Second, determine whether SBEM adequately represents the design or whether an approved DSM is needed. Third, match the exact product, version and underlying engine to the current official approved list. Finally, preserve that information with the calculation file and BRUKL report. The NCM version policy also governs which approved version may be adopted relative to the building-control application and reporting stages.(Approved software)

Part L 2026 and the Future Buildings Standard: what changes and when?

 

The Future Homes and Buildings Standards package was made and published in March 2026. For buildings other than dwellings, this is often referred to as the Future Buildings Standard. It is not a consultation draft. It is also not the general operative Part L standard for ordinary England work as at 5 September 2026.(ADL2 2026)

 

The distinction between publication, methodology and commencement is important:

 

ItemStatus at 5 September 2026Practical implication
Approved Document L Volume 2, 2021 edition incorporating 2023 amendmentsCurrent technical guidance for projects within the 2021 regime.Use it for the live compliance route unless the project has another valid transitional basis.
England NCM 2026Formally approved in a 24 March 2026 methodology notice.It identifies the future-regime NCM framework, but a methodology notice is not a generic approval of every commercial software build.(Methodology)
Part L 2026 / ADL2 2026Final and published.It generally takes effect on 24 March 2027 for non-HRB work and 24 September 2027 for specified higher-risk-building (HRB) work.(BR2026)
Commercial calculation software for the 2026 regimeMust be checked against the live NCM/MHCLG approval list.The April 2026 list verified Part L 2021 versions; it did not by itself establish that a current 2021 iSBEM, DesignBuilder or IES VE build is approved for 2026 outputs.(Approved Software)

For ordinary non-HRB work, the 2026 transition may preserve the prior requirements where the relevant building-control notice or full-plans application was submitted before 24 March 2027 and work on that particular building begins before 24 March 2028. HRB work has separate Gateway 2-based transition arrangements. The applicable route must be considered building by building rather than assumed across an entire development.

 

The Future Buildings Standard retains the non-domestic whole-building approach. The actual building is still assessed against a same-size-and-shape notional building, and the two central performance tests remain emissions and primary energy: BER against TER, and BPER against TPER. The as-built calculation still requires the constructed specification and measured air permeability where testing applies. (approved methodologies)

 

The published notional package is more demanding in several respects. The final policy position includes good fabric, low-carbon heating assumptions, enhanced lighting efficacy and heat recovery. For side-lit and top-lit non-domestic spaces, the notional building includes photovoltaic generation equivalent to 40% of the actual building’s foundation area, subject to defined exceptions. (FHS consultation)

 

That 40% figure needs the same careful explanation as a notional U-value or system type: it is a target-setting assumption, not a simple instruction that every actual commercial building must install precisely 40% PV. The actual design may vary if it satisfies both target rates and applicable limiting standards. The new L3 renewable-electricity functional requirement is directed to buildings that are, or contain, dwellings; it should not be presented as a blanket standalone commercial-building PV mandate.(FHS consultation)

 

The right preparation is to design for the future standard where the programme will fall under it, but to avoid premature claims. Before a 2026-regime calculation is issued, check the project’s transition position, the current NCM documents, the exact approved software implementation and the Building Control route.

SBEM and Part L: a short history

 

SBEM has developed alongside changes to Part L. The history is useful because it explains why an old model, engine or target cannot simply be renamed for a current project.

 

MilestoneRegulatory and methodology developmentWhy it matters now
2006The calculation-led modern Part L regime introduced an approved methodology, target CO₂ rates and a requirement for new buildings not to exceed the target. By 2008, official NCM guidance recorded SBEM and other approved tools for non-domestic compliance and EPC asset ratings.Established the actual-versus-notional carbon-compliance approach and version-specific tool approval.
2010Part L and the NCM were updated from 1 October 2010. The notional building and data were revised, and a solar-gain criterion was added. Compliance remained principally a TER versus actual CO₂-rate test.(NCM Modelling guide)Demonstrates that a change in NCM is not just a new software interface; it can change the target-building assumptions and evidence required.
2013 regime, effective 2014The England non-domestic NCM/Part L uplift targeted an average 9% CO₂ saving against the 2010 non-domestic mix. The headline target continued to be CO₂-led. (NCM Modelling guide)The domestic fabric-efficiency test introduced in the wider reforms should not be misdescribed as a non-domestic BPER test.
2021 regime, effective 2022England added target primary energy to the established carbon route. New non-domestic buildings must demonstrate both BER ≤ TER and BPER ≤ TPER.This remains the current core framework for relevant 2021-regime projects. A carbon pass alone is insufficient.
2026 package, generally effective 2027The made Future Buildings Standard package publishes updated Part L and NCM material, retained TER/TPER logic and stronger notional assumptions.Future law and guidance require planning, but date, transition and approved software must be verified before use. (ADL2 2026)

The central lesson is that legislation, Approved Documents, the NCM, notional-building settings, software approval and individual project transition are different control points. An assessor must check all of them; no single “SBEM version” label answers the compliance question.

New builds, extensions, conversions and change of use

 

Not every non-domestic project needs the same calculation. Correct classification at the outset avoids unnecessary modelling and, equally, prevents an extension or fit-out being missed because it is not described as a “new building”.

 

Project typeTypical England Part L Volume 2 routeIs an SBEM / approved DSM calculation automatically required?
New non-domestic buildingWhole-building target calculation, limiting standards, services, commissioning and evidence.Yes. An approved NCM implementation is required for the new-building performance route. SBEM is one option; an approved DSM is another.(ADL2) (approved methodologies)
First fit-out of a shell-and-core buildingNew-building first-fit-out provisions apply where listed services are provided or extended.Often yes, depending on the fixed services and scope. Later fit-outs are generally existing-building work and need separate assessment.1(ADL2)
Large extension treated as a new buildingSections for new buildings apply where the extension is both over 1,000 m² and over 25% of the existing building’s total useful floor area.Yes. Test both thresholds; an extension label does not prevent a new-building route.1
Ordinary non-domestic extensionElemental, opening-area and area-weighted U-value routes are available, with an approved calculation alternative.No, not by default. SBEM may be selected to show the building plus extension performs no worse than the building plus a notional extension.(ADL2)
Material change of use / non-domestic conversionExisting-building improvements to elements, fittings and services, with a stated calculation alternative.No, not by default. The calculation alternative tests post-change BER/BPER against the elemental baseline; it is not automatically the new-build TER/TPER test.(ADL2)
Change to energy statusExisting-building route, for example where a previously unheated space becomes part of the conditioned building.No, not by default. Scope the works and services carefully; do not assume a full new-build calculation.
Thermal-element renovationImprove the whole element where major renovation or more than 50% of the element surface is renovated, subject to feasibility.No. This is primarily an elemental and feasibility route, though modelling may inform design choices.(ADL2)
Consequential improvementsMay apply to qualifying existing buildings over 1,000 m² where there is an extension, first fixed services or increased service capacity.Not as an independent default requirement. It is a feasibility/value/measure obligation, although an SBEM alternative selected for an extension must include applicable improvements.(ADL2)

A material change of use can involve a building becoming a dwelling or gaining a flat. That is a warning not to default to Volume 2/SBEM. The dwelling portion needs the correct domestic Part L / SAP route, while genuinely non-domestic areas remain under Volume 2. Mixed-use schemes should define the boundary, services and evidence responsibilities early.

 

Guiding You Through the Part L SBEM Process

Whether you’re just starting your project or nearing completion, gain support at every step to help achieve full compliance with ease. From initial consultation and SBEM calculation to generating the BRUKL report, SBEM compliance is simplified with our expert guidance.

  • Initial Consultation: Your building design will be reviewed to ensure it aligns with energy efficiency targets, providing early feedback for the best results.
  • SBEM Calculation: Once your design is finalised, we’ll conduct the SBEM calculation to assess energy use, heat loss, and low-carbon technology integration.
  • BRUKL Report: We’ll generate the BRUKL report to confirm compliance with Building Regulations and provide the necessary documentation for Building Control approval.
  • Final Assessment & EPC: After construction, the SBEM model will be updated to reflect any changes and issue the As Built SBEM report alongside your Energy Performance Certificate (EPC).

Air testing, EPCs, energy statements and Part O: connected but separate

 

Air-tightness testing and SBEM

Pressure testing is a practical example of why the final model matters. For relevant new non-domestic buildings, the current England guidance generally expects pressure testing, subject to defined exceptions. The measured air-permeability result must be used in the as-built BPER and BER calculation. If the building is below 500 m², an exception may allow testing to be avoided only by using an assumed 15 m³/(h·m²) at 50 Pa in the calculation. That is a conservative model input, not a permissible achieved result or evidence that the building performs at 15.

An air test and an SBEM report are therefore linked but not interchangeable. The test is fabric evidence. The as-built BRUKL is the calculation output that uses the measured result. A design assumption cannot replace a final test where testing is required. For test procedure, programme and remedial strategy, use the planned Air Tightness Testing page.

Non-domestic EPCs

An EPC is a related but separate legal output. Non-domestic EPCs use the NCM asset-rating framework and may share underlying data with the Part L calculation. On construction, the EPC Regulations set separate delivery, registration and notification duties. An EPC does not replace the Part L design/as-built calculations, pressure-test evidence, commissioning documentation or owner information.

This is especially important on shell-and-core projects and separately lettable units. Confirm the EPC boundary and expected fixed-services fit-out early with an accredited assessor. Refer readers to Non-domestic EPCs for the certificate route, rating and transaction triggers.

Planning energy statements

A planning energy statement is not a nationally standardised Part L certificate. It is usually required by an adopted local-plan policy, a planning condition or a local validation requirement. An SBEM result may be useful evidence, but it only helps if it addresses the requested boundary, baseline, target and stage of certainty. “Part L compliant” does not automatically mean “planning policy compliant”.

For planning-specific methodology, local-policy review and energy hierarchy work, link to Energy Statements.

Part O overheating

Part O is not a general non-domestic SBEM requirement. Current Approved Document O applies to new residential buildings and relevant residential parts of mixed-use schemes. A stand-alone office, retail unit, warehouse or industrial building does not become a Part O project simply because it has glazing, cooling or an SBEM model.

A mixed-use development can need several separate but coordinated workstreams: Volume 2 / SBEM for commercial areas; SAP for dwellings; and Part O evidence for the residential parts in scope. Facade changes, shading, opening areas, cooling and communal pipework can affect several workstreams. See the planned Part O Overheating page for a dedicated guide.

FAQs

Is SBEM mandatory for every commercial building project?

No. A new non-domestic building requires an approved NCM calculation, but that can be SBEM or an approved DSM. Existing-building work, ordinary extensions, renovation and change of use may use elemental or other Volume 2 routes unless the project selects a stated calculation alternative or meets the threshold for an extension treated as a new building.

What does a BRUKL report prove?

A BRUKL report is the standardised output that presents Part L calculation evidence from approved software. A design-stage report records the intended specification and rates; an as-built report records the completed specification and updated results. It does not, by itself, replace testing, commissioning, EPC registration, statutory notices or Building Control decisions.

What is the difference between BER and BPER?

BER measures calculated carbon-dioxide emissions. BPER measures calculated primary energy. For a new England non-domestic building within the 2021 route, BER must not exceed TER and BPER must not exceed TPER. Both tests must pass.

Does a building that passes BER automatically pass BPER?

No. Carbon and primary-energy factors affect systems and fuels differently. A design should be tested against both metrics before the specification is fixed.

Can we use iSBEM, DesignBuilder or IES VE for Part L?

Each can be appropriate when the exact product, version, engine and route are on the official approved-software list for the project’s regulatory cohort. Under the verified Part L 2021 list, iSBEM v6.1.e is a direct SBEM route; DesignBuilder v7.3.1 and IES VE v7.0.31 have separately listed DSM and FI-SBEM routes. That is not a permanent brand-wide approval, so recheck before issue.

Is a dynamic model always better than SBEM?

No. SBEM is permitted for any building size, but may require approximation for some features. An approved DSM can offer more flexibility and design support where the features or design questions warrant it. The selected DSM still needs to be approved for the Part L/NCM purpose and modelled correctly.

Do all extensions need an SBEM calculation?

No. A non-domestic extension only becomes a new-building route when it is both over 1,000 m² and over 25% of the existing building’s total useful floor area. Other extensions may follow elemental or area-weighted routes, with an optional calculation alternative where appropriate.

Does a conversion automatically require SBEM?

No. The correct route depends on whether the resulting space remains non-domestic, becomes a dwelling, changes energy status, receives new fixed services or meets another specific trigger. Material change of use has an existing-building baseline with a possible calculation alternative; it is not automatically a new-build BER/TER and BPER/TPER test.

Does an SBEM pass mean an EPC will be issued?

Not automatically. The EPC is a separate registered deliverable under separate regulations, using an appropriate approved calculation implementation and an accredited assessor. It should be planned alongside the Part L assessment, but not treated as the same document.

Does the Future Buildings Standard apply now?

The final 2026 package is published, but its main requirements generally take effect on 24 March 2027 for non-HRB work and on 24 September 2027 for relevant HRB work. Transitional arrangements can preserve prior requirements for qualifying work. Check the notice/application, commencement and HRB facts for the individual building.

Can Part L SBEM results predict our operating energy use?

No. SBEM/Part L applies standardised assumptions for a consistent compliance comparison. It should not be used as a direct forecast of actual consumption. Where operational performance matters, set up a separate scope, data basis and methodology.

Start with the right Part L calculation route

 

A successful Part L SBEM project starts with classification and evidence control, not a late BRUKL upload. Before appointing an assessor, establish the building use and boundaries, jurisdiction, project type, total useful floor area, fixed-services scope, building-control application date, commencement position, HRB status and whether planning or EPC evidence is also required.

Energy Report can then help select an appropriate approved NCM route, develop realistic BER and BPER targets, review fabric and services options, prepare the design-stage submission, coordinate air testing and commissioning evidence, and update the model for the completed building. For domestic parts of a mixed-use scheme, begin the parallel Part L SAP Calculations workstream early rather than trying to apply one method to every area.

Contact Energy Report with the latest drawings, building use schedule, floor areas, MEP strategy, proposed fabric and glazing, renewable strategy, building-control dates and any existing energy models. The first task is to confirm the applicable route and software version, then build a calculation that can be delivered as designed and evidenced as built.

Benefits

  • Expert advice and support at every stage
  • Fast, accurate assessments helping you to achieve your energy efficiency goals
  • Low Carbon Technology Integration
  • Dynamic simulation modelling option
  • Professional provision of energy statements and BRUKL reports

 

Contact Us for Expert Part L SBEM Compliance

Get in touch with our team and we’ll guide you through the SBEM process, helping you meet regulatory requirements and achieve your energy efficiency goals with ease.