The Future Homes Standard moves the notional airtightness assumption from 5 to 4. Learn what this means for design, air testing and programme risk.
The Future Homes Standard retains the 8 m³/(h·m²) at 50 Pa limiting value for new dwellings, but tightens the notional dwelling used for compliance from 5 to 4 m³/(h·m²) at 50 Pa. This makes airtightness a more significant design and delivery issue for housebuilders.
Published in 2026, the standard comes into force in England on 24 March 2027, subject to project-specific transitional arrangements. A result of 5 may still comply, but it provides less headroom within the whole-dwelling calculation.

Part L assesses a proposed dwelling against a notional dwelling of the same size and form. That reference dwelling has set assumptions for fabric, services, ventilation and airtightness. Under the Future Homes Standard, the notional airtightness assumption is 4 m³/(h·m²) at 50 Pa, compared with 5 under the Part L 2021 approach.
The 8 m³/(h·m²) figure has a different purpose. It is the limiting value: a dwelling cannot simply trade its way out of an air-test result above that threshold. For project teams, it is a legal backstop rather than a sensible design target. Building to the backstop leaves little room to manage variation in workmanship, services coordination or final test results.
A dwelling that tests at 5 is not an automatic failure. The calculation looks at the dwelling as a whole. But because the reference home is now assumed to be tighter, the proposed home has more infiltration heat loss to offset. That can reduce compliance headroom and put more pressure on other elements of the design.
The right response depends on the dwelling type and the calculation. It may involve better continuity of insulation, more accurate thermal-bridge values, an improved glazing strategy, or fully coordinated heating and ventilation. The important point is that these choices are made while the design can still change—not after procurement or when the plot is close to completion.
For architects, MEP consultants and contractors, airtightness should be a shared design responsibility. A robust approach is to:

The Future Homes Standard starts on 24 March 2027 in England. For eligible non-higher-risk projects, transitional provisions can apply where the relevant building-control notice or application was submitted before that date and work has commenced on the building before 24 March 2028. Confirm the route at project level, particularly on phased schemes.
That makes now the right time to review standard house types, thermal-bridge details, SAP strategy, ventilation approach and air-testing process together. The target is not simply a better test score. It is a repeatable specification that the design team and site team can deliver with confidence.
No. The limiting value remains 8 m³/(h·m²) at 50 Pa. The key change is the tighter 4 m³/(h·m²) notional assumption used to set the compliance benchmark.
No. A different result may still comply if the whole-dwelling calculation meets the relevant requirements. However, treating 4 as a practical design ambition can provide more resilience than relying on compensating measures elsewhere.
Bring them in at RIBA Stages 2–3, before fabric and services specifications are fixed. Keep them informed of design changes, then agree inspection and test points with the contractor before works start.
We always welcome new projects so if you need a dedicated consultant, we are here to help. Contact us today to build a better future.