Energy Report supported existing client Ashurst Developments on a new detached house in Lyndhurst, Hampshire, to the rear of an old hotel guest house. Our work combined Part L SAP calculations, a Part O overheating assessment, thermal bridging calculations, Part F extract testing and airtightness testing bringing the design assessments and on-site checks together within one consultancy package.
Client: Ashurst Developments
Setting: Lyndhurst, Hampshire, New Forest
Development: One detached new-build house behind an old hotel guest house
Services: SAP, overheating assessment, thermal bridging, extract ventilation testing and airtightness testing
A single new home still brings several compliance workstreams. Energy performance, summer overheating risk, heat loss at construction junctions and installed ventilation each need attention. The on-site testing then has to connect with the information used to assess the house.
For this Lyndhurst project, the task was to bring those services together for a returning client. The new house was a separate new-build dwelling behind the guest house, not a conversion of the existing building. Its own design and construction needed to be the basis of the assessments.
We provided the Part L SAP calculations and Part O overheating assessment alongside thermal bridging calculations. Together, these workstreams addressed the home’s modelled energy performance, overheating risk and heat loss through relevant construction junctions.
Our scope also included Part F extract testing and airtightness testing on site. These are different checks: one measures the performance of installed extract ventilation, while the other measures air leakage through the building envelope. Both contribute useful evidence about the completed home.
We carried out Standard Assessment Procedure calculations for the new dwelling. SAP brings the building fabric, glazing, heating, hot water, ventilation and other relevant inputs into a standardised energy assessment to support the Part L compliance process.
We assessed overheating risk for the proposed house. Part O considers unwanted solar gains and the means of removing heat. It addresses a different question from SAP, so energy efficiency and overheating need to be considered together rather than treated as interchangeable assessments.
We calculated heat loss at relevant construction junctions. These junctions can influence the fabric-performance inputs used in SAP; assessing them helps connect the energy calculations to the construction details.
We tested the installed extract ventilation. Measuring extract airflow provides evidence of ventilation performance on site, rather than relying only on the fan’s stated specification.
We carried out an air pressure test to measure envelope air leakage. The result provides a measured input for the energy-assessment process and can be compared with the project’s air-permeability target.
Ashurst Developments received support across all five areas of the agreed scope. The project brought energy calculations, overheating assessment, junction calculations and on-site testing into one package for the detached home in Lyndhurst.
The value was continuity between the technical assessments and the site checks. For a returning developer, one consultancy covering these related services gives the team a clearer point of contact and a more connected set of information to work with.
New-home compliance works best when each assessment informs the next decision. SAP does not replace overheating assessment, and a low air-leakage rate does not replace designed ventilation. Treating these as connected but distinct tasks helps a project team keep the specification and evidence consistent.
This Lyndhurst project reflects the value of a repeat-client relationship: practical technical support across the energy and testing workstreams, with an understanding of the developer’s project needs. For housebuilders and self-builders in Hampshire and the New Forest, that is a useful approach whether the scheme is one home or several.
We carried out Part L SAP calculations, a Part O overheating assessment, thermal bridging calculations, Part F extract testing and airtightness testing for a new detached house behind an old hotel guest house in Lyndhurst, Hampshire.
No. SAP assesses standardised dwelling energy performance for the Part L process. Part O assesses overheating risk. The two workstreams should use consistent design information, but they address different requirements.
They measure different aspects of a home. Extract testing measures airflow through the installed extract system. Airtightness testing measures air leakage through the building envelope. One test cannot stand in for the other.
Yes. We provide SAP calculations, overheating assessment, thermal bridging and on-site testing support for residential projects in Lyndhurst, across Hampshire and throughout the South of England.
Talk to Energy Report about SAP calculations, Part O, thermal bridging and completion-stage testing for your next project. We offer practical, connected support for developers, architects and self-builders across the New Forest and the South of England.
Request a quote | Call 01489 883231 | info@energyreport.co.uk
Related project: New Build – Lyndhurst, New Forest
A credit to the developer was the Air Pressure test result of 3.64 m3.h-1.m-2 @ 50 Pa.
We always welcome new projects so if you need a dedicated consultant, we are here to help. Contact us today to build a better future.